Maintenance Log, 2006
Maintained by James Williams and Deborah Stern, third owners.
Biweekly: Perkins 4-108 engine, run in gear at 2200 RPM, 15-30 minutes, sailing or not.
Monthly: Bottom cleaning and zinc inspection (and renewal as necessary), by Fastbottoms, Alameda, CA.
12/12/05 - 2/24/06 – Removed old varnish on handrails and cockpit hatchway and hatches. Sanded and primed with Penetrol and applied six coats of Epifanes Varnish. Work performed by Any Neuvecelle-Buckles (see invoice #0621 dated 1/24/06).
3/13 - Engine maintenance. Checked belts, coolant, fuel filters, and changed oil.
5/29 - Polished all the stainless and winches, using Bright Boy.
6/5 - Pumped out head and gave the whole system a thorough cleaning.
6/24 - General interior cleaning. Polished hull with Starbrite Marine Teflon Polish.
9/7 - Polished hull with Starbrite Marine Teflon Polish.
10/5 - Repaired steering system, replacing cable, straightening bent sheaves a mounts. Work performed by Rob Bastress, Bastress Custom Boats (see invoice dated 10/5/06).
10/22 - Maintenance on teak cap rails, two coats Epifane High Gloss Varnish on handrails and hatch entry way, and one coat varnish on hatches. Work performed by Any Neuvecelles-Buckles (see invoice #10103, dated 10/22/06).
Biweekly: Perkins 4-108 engine, run in gear at 2200 RPM, 15-30 minutes, sailing or not.
Monthly: Bottom cleaning and zinc inspection (and renewal as necessary), by Fastbottoms, Alameda, CA.
12/12/05 - 2/24/06 – Removed old varnish on handrails and cockpit hatchway and hatches. Sanded and primed with Penetrol and applied six coats of Epifanes Varnish. Work performed by Any Neuvecelle-Buckles (see invoice #0621 dated 1/24/06).
3/13 - Engine maintenance. Checked belts, coolant, fuel filters, and changed oil.
5/29 - Polished all the stainless and winches, using Bright Boy.
6/5 - Pumped out head and gave the whole system a thorough cleaning.
6/24 - General interior cleaning. Polished hull with Starbrite Marine Teflon Polish.
9/7 - Polished hull with Starbrite Marine Teflon Polish.
10/5 - Repaired steering system, replacing cable, straightening bent sheaves a mounts. Work performed by Rob Bastress, Bastress Custom Boats (see invoice dated 10/5/06).
10/22 - Maintenance on teak cap rails, two coats Epifane High Gloss Varnish on handrails and hatch entry way, and one coat varnish on hatches. Work performed by Any Neuvecelles-Buckles (see invoice #10103, dated 10/22/06).
0 Comments:
Post a Comment
<< Home